一色桃子AV无码专区,国产精品美女久久久久久,亚洲精品美女一区二区,一级特黄录像播放在线观看视频,又大又粗又长又硬好爽

Baotou BYD Cleaning Room and Air Conditioning System Project

Release time: 2024.03.06
 Number of visits: 1

The Baotou BYD Cleaning Room and Air Conditioning System Project is located in the newly planned area of the Equipment Manufacturing Industrial Park in Baotou, Inner Mongolia. With a construction area of 68,000 square meters, it serves as a crucial link in constructing the BYD blade battery industry chain and represents BYD's first large-scale lithium battery ultra-thin copper foil production project in the autonomous region. The project aims to meet the production demand for 30 GWh of blade batteries. Upon completion, the project will establish Baotou's Qingshan District as an important base for BYD's copper foil production. The construction scope includes clean decoration, ventilation, lighting and power, heating, chilled water, cooling water, insulation, secondary steel structure, and automatic control engineering.

 

  • toolbar
    Back to Top
一色桃子AV无码专区,国产精品美女久久久久久,亚洲精品美女一区二区,一级特黄录像播放在线观看视频,又大又粗又长又硬好爽